Ace the 2025 OFR Driver & Aerial Operator Test – Elevate Your Skills and Drive to Success!

Question: 1 / 400

Which performance test requires a discharge hoseline from a second pumper?

Discharge pressure gauge and flowmeter operational tests

Priming system test

Tank-to-pump flow test

Internal intake pressure relief valve test

The performance test that necessitates a discharge hoseline from a second pumper is related to the internal intake pressure relief valve test. This specific test helps verify that the pressure relief valve functions correctly under operational conditions by allowing the flow from a different source.

During this test, a secondary pumper provides additional water flow, which is crucial for creating the necessary conditions to assess the performance of the internal intake pressure relief valve adequately. This setup helps monitor how the valve responds when subjected to varying pressure scenarios, ensuring it opens and closes properly in real-world situations, ultimately contributing to operator safety and equipment reliability.

In contrast, the other tests focus primarily on different aspects of the pumper’s functionality without requiring a discharge hoseline from an external source. For example, the discharge pressure gauge and flowmeter operational tests measure the pump’s capabilities at specific settings without needing a second pumper. Similarly, the priming system test assesses the pump's ability to draw in water, and the tank-to-pump flow test observes water transfer from the tank to the pump, both of which do not rely on a secondary flow source for completion.

Get further explanation with Examzify DeepDiveBeta
Next Question

Report this question

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy